German Chemical Industry’s Record-breaking Recovery
All of the key economic indicators – production volume, chemical prices, turnover – in the German chemical industry grew in the first half of 2021.
Your company is already operating in Germany and you would now like to export worldwide?
All of the key economic indicators – production volume, chemical prices, turnover – in the German chemical industry grew in the first half of 2021.
Germany’s digital economy is booming in a number of sectors as coronavirus pandemic accelerates the country’s digitalization process.
The global coronavirus pandemic has not slowed down start-up activity in Germany for all, with tech and high-tech start-ups in particular responding robustly to the challenges of the crisis.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
supply, delivery, erection and commissioning of interim container school accommodation at Vat Bushi School, Lalez
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Contract 1: new installation and rehabilitation of compact drinking water treatment plants and river water intake structures in the Southern Nineveh Region; locations:
1. AL MESHRAG 200 m3/hr WTP
2. SAAF AL TOOTH 200 m3/hr WTP
3. AL SAFINA 200 m3/hr WTP
4. TOLLUL NASIR 500 m3/hr WTP
5. SHEWARAT 200 m3/hr WTP
6. AL DANACH 200 m3/hr WTP
7. RUFAILA 200 m3/hr WTP
8. OLD ZAWYA 200 m3/hr WTP
9. NEW ZAWYA 200 m3/hr WTP
Detailed design, geotechnical surveys and topography
...
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Lot 2: Rehabilitation of the drinking water supply network of the city of Mbuji-Mayi in the Kasai-Oriental province, including reinforcement of a dam, construction of 2 water towers, construction of a water reservoir, construction of boreholes, construction of pipeline networks, etc.
Further details are available in the original document in French language (see Download)!
Germany’s accommodation and food service sectors recorded a 61.7 percent increase in turnover on the previous month in June.
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
For the development of Hydropower and Renewable Energy II (HRE II) – Component I (Hydropower) in the region, a Pre-feasibility study was undertaken and 4 Hydropower plants have been identified with an installed capacity between 1MW -2MW. Two out of these four HHPs will be newly constructed HHPs (Batura and New Sumayar II), while the other two are rehabilitation projects of existing HHPs (Chalt I and Hassanabad I). The projects are located in the Hunza and Nagar...
Consumers in Germany’s food and beverages market are increasingly turning to organic, vegetarian and vegan alternatives in a growing market that is both environmentally friendly and sustainable.