Tender Notice Ukraine Smart Grids
Reconstruction of 220 kV Substations
Prequalification
Dec 11, 2024
- Country Ukraine
- Deadline Feb 03, 2025
- Financing KfW Entwicklungsbank
- Reference Number BMZ201965128/KfW512092
- Subject Increasing Efficiency in Electricity Transmission (Integration of the Ukrainian IPS to the European Integrated Power System) III
Requested Services:
- Design and engineering, manufacturing, testing, shipment/transportation, installation and commissioning of primary and secondary equipment and systems for the rehabilitation of 220 kV Substations Lviv-2 and Stryi (Lot 1 and Lot 2), includes construction of the buildings as underground or aboveground protective structures which shall provide protection against wartime threats