Rehabilitation of the Sewerage Network Prizren
Tender Award
Financing: KfW Entwicklungsbank
Brief description of the Contract:
Rehabilitation of the Sewerage Network (Prizren)
About 8.75 km of existing Sewer Lines (from DN 200 to DN 400 and depth between 2 – 5 m) and about 214 manholes shall be replaced/rehabilitated at their same location within various roads and dense urban sites, which requires beside common safety measures (ESHS management) and others demolition, handling of wastewater and traffic management. The Time for Completion of the Works is 547 calendar days, followed by the...