Your company is already operating in Germany and you would now like to export worldwide?

Tender Notice Georgia Water Supply, Irrigation

Construction Services, Rehabilitation of Water Supply and Sewer/Stormwater Network in the City of Vani

Tender Award

  • Country Georgia
  • Financing KfW Entwicklungsbank
  • Reference Number KfW509597; IM-1/P1: VANI (WAT, SAN, WAT)
  • Subject Communal Infrastructure for Environment and Tourism Improvement – Imereti Region/Georgia

Brief Description of the Contract:

  • Construction of the water network, sewerage network, and storm water network in Vani, e. g. construction of the following works

Rehabilitation of Intake

  • Source protection measures
  • Refurbishment of shallow wells
  • Entire reconstruction of the intake pumping station incl. chlorination unit, operator/guard room, and SCADA/electrical room, and all required equipment
  • Replacement of pumps and related pipework and mechanical equipment
  • Installation of flow meters
  • Replacement of chlorination unit
  • Replacement of the SCADA system
  • Refurbishment of civil structures
  • Replacement of transformer and power supply
  • Decommissioning/dismantling and disposal of old buildings at the territory incl. equipment

Reservoir

  • Replacement of pipework and water meter in the inlet chamber
  • New equipment at the entrance manhole
  • Construction of a new reservoir

Water Supply Network
In the existing supply area:

  • Replacement of approx 14 km pressure pipes in the distribution network including reconnection of approx. 360 house connections.
  • Laying of approx. 3 km of new pipes including installation of approx. 65 house connections.
  • Installation of 4 pressure-reducing valves

In the extension areas:

  • Laying of 22 km of new pipes including installation of 360 house connections
  • Construction of a new booster pumping station
  • Construction of a new elevated tank (35 m3)

Sewer Network

  • Construction of approx. 2.5 km main collector
  • Construction of one main pumping station and 15 small manhole pumping stations
  • Laying gravity sewer network (approx. 40 km in total length) with approx. 1.400 inspection manholes and 1.200 house connections
  • Laying pressurized pipes (approx. 6 km in total length)
  • Reinstatement of all asphalt or concrete road surface

Storm water Network

  • Construction of pipes, approx. 0.3 km (corrugated HDPE pipes)
  • Replacement of approx. 0.4 km of the existing channels
  • Construction of concrete canals, approx. 6.6 km
  • Construction of 19 concrete manholes
  • Construction of 6 free-flow concrete outlets

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

Log in