Your company is already operating in Germany and you would now like to export worldwide?

Tender Notice North Macedonia Photovoltaics

Preparation and Construction Supervision for Photovoltaic Power Plants and Transformer Substations

Prequalification

  • Country North Macedonia
  • Deadline Aug 07, 2024
  • Financing KfW Entwicklungsbank
  • Reference Number BMZ202068328/202070241/KfW511233
  • Subject Energy Transition – Renewable Energy Programme North Macedonia “Photovoltaic Power Plants (PVPPs) Bitola 2 and optionally Bitola 3”

Requested services: 

Qualified independent consultants are invited to submit prequalification documents for consulting services for the implementation of the a.m. project. The project comprises the design, supply, installation, construction, and commissioning of the following four components: 1) the construction of the PVPPs Bitola 2 with an installed capacity of 50-60 MW and optionally PVPP Bitola 3 with an installed capacity of 100 MW, 2) the construction of a new 110/35 kV transformer substation at the site of Bitola 2, 3) the construction of a new 110/35 kV transformer substation at the site of Bitola 3 (optionally), 4) realization of the grid connection of PVPP Bitola 2 and optionally PVPP Bitola 3. 

The Consultant shall provide expertise in concept preparation, tendering, engineering, construction, and commissioning supervision to ensure the implementation of the project with respect to time, cost and quality. The Consultant will fulfill the role of a FIDIC Employer’s Representative (FIDIC Yellow Book).

You must be logged in to access this page

Please click "Log in" to log in with your user details. If you do not have a GTAI user account yet, you can sign up free of charge in order to have access to all our services and information. Sign up now.

Log in

Please log in on this page with your log-in details.