Energy Equipment
The top priority for replenishment is the autotransformers fleet. As of today, the need, including the replenishment of the emergency stock is the following:
- AT 750 kV - eleven phases;
- AT 330 kV - sixteen units;
- AT 220 kV - six units.
The amount of other damaged primary equipment high voltage circuit breakers, disconnectors, surge arresters, measurement transformers, and shunt reactors is tremendous as well.
Just a few figures for a clearer picture:
- current transformers 750 kV - 21 phases;
- circuit breakers 330 kV – 15 units in 3-phase set;
- circuit breakers 110 kV - 25 units in 3-phase set;
- disconnectors 110 kV with one earthing switch - 33 units in 3-phase set;
- voltage transformers 220 kV - 15 phases, etc.
Another priority is the relay protection and automation devices. The current demand constitutes at least of:
- 13 sets of distance and overcurrent protection;
- 20 sets of circuit breaker control automatics;
- 6 sets of differential busbar protection;
- 10 sets of command transmission equipment.
As for thermal power plants, the needs are also substantial. In particular:
- circuit breakers 110 kV - 6 units in 3-phase set;
- circuit breakers 330 kV – 3 units in 3-phase set;
- disconnectors 110 kV with one earthing switch - 9 units in 3-phase set;
- current transformers 110 kV - 6 phases;
- voltage transformers 110 kV - 3 phases, etc.
The hydropower system is at risk as well and JSC Ukrhydroenergo needs the replenishment of its emergency stock of autotransformers 330 kV 7 units) and power transformers 330 kV 4 units) and 110 kV 7 units).
Civil Protection Needs
Please see below the priority civil protection needs, which were compiled by the State Emergency Service of Ukraine:
- modular houses - 6500 units for 20 people with an internal lighting system);
- residential modules - 820 units;
- sanitary modules - 164 units;
- bedroom sets - 130,000 units;
- electric generators – 6,828 units with the capacity >10 kW - 6500 units, >100 kW – 164 units, >400 kW – 164 units);
- heat guns of indirect heating on liquid fuel or on electricity, with a thermostat and air distribution sleeves - 13,000 units;
- mobile drinking water purification stations - 164 units. at least 1.5 cubic meters per hour);
- tank trucks for the delivery of drinking water - 164 pcs. at least 8 cubic meters).